China Design Steel Structure Storage Building Prefabricated Steel Warehouse

Product Details
Customization: Available
After-sales Service: 1
Connection Form: Welded Connection
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2015

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Management System Certification
ISO 9001
OEM/ODM Availability
Yes
  • China Design Steel Structure Storage Building Prefabricated Steel Warehouse
  • China Design Steel Structure Storage Building Prefabricated Steel Warehouse
  • China Design Steel Structure Storage Building Prefabricated Steel Warehouse
  • China Design Steel Structure Storage Building Prefabricated Steel Warehouse
  • China Design Steel Structure Storage Building Prefabricated Steel Warehouse
  • China Design Steel Structure Storage Building Prefabricated Steel Warehouse
Find Similar Products

Basic Info.

Model NO.
steel workshop
Certificate
ISO9001:2008
Size
Customized
Color
According to Customer′s Requirement
Property
Carbon Steel
Frame
Steel Frame
Wall
Sandwich Panel or Single Steel Sheet
Roof
Sandwich Panel or Single Steel Sheet
Door
Sliding Door or Rooler Door
Window
Aliuminum Alloy Window
Purlin
Z or C Type
Type
H-Section Steel
Steel Type
Quality Carbon Structural Steel
Forming
Hot-Rolled Steel
Member
Steel Column
Type of Steel for Building Structure
H-Section Steel
Transport Package
Standard Package
Specification
According to customer′s requirement
Trademark
Tailai
Origin
China
HS Code
9406
Production Capacity
2000t/Month

Packaging & Delivery

Package Size
1100.00cm * 200.00cm * 260.00cm
Package Gross Weight
22000.000kg

Product Description

China Design Steel Structure Storage Building Prefabricated steel warehouse

China Design Steel Structure Storage Building Prefabricated Steel Warehouse
1. Steel construction is also called steel fabrication,it have many advantages:
 

China Design Steel Structure Storage Building Prefabricated Steel Warehouse

* They are super-quick to build at site, as a lot of work can be pre-fabbed at the factory.

* They are flexible, which makes them very good at resisting dynamic (changing) forces such as       wind or earthquake forces.

* A wide range of ready-made structural sections are available, such as  I , H,   U  and angle section
 
* They can be made to take any kind of shape, and clad with any type of material
 
* A wide range of joining methods is available, such as bolting, welding, and rivet



2.  Steel structure construction has numerous advantages over concrete construction.

* Steel is a highly durable metal. It can withstand a considerable amount of external pressure.
 Hence, steel structures are earthquake resistant whereas concrete structures are brittle. Concrete
  is not as resistant as steel.


* Steel structures have a good load carrying capacity unlike concrete structures, which have a low
  load carrying capacity.

* Steel is a tensile metal. It has a high strength to weight ratio. Steel structures weigh 60% lesser     than concrete.
 
* Steel structures can be made without a foundation but this is not applicable to concrete     structures as they are heavy.
 
* The construction process is faster with steel structures as they are easy to erect. This contributes to faster project completion. On the other hand, concrete construction is time-consuming.

*  Having a good scrap value also makes structural steel a better option than concrete which has practically no scrap value.

* Steel structures can be easily fabricated and mass produced. They are so versatile that they can be easily assembled, disassembled and replaced. Steel structures can be modified even for last minute changes. 

*  Another advantage of steel structures is that they can be constructed off-site by professional steel fabricators and then assembled on site.

*  Steel structures are an eco-friendly option as they are easily recyclable. This means you get to save money in waste management.

* Lastly, steel structures are easy to transport as they are lightweight. Steel structure construction is a safe option, there are no health ha
zards of using steel structures in construction.

* Weifang tailai  undertakes all kinds of fabrication projects. Our team of experienced professional steel fabricators is well equipped to fulfill all your fabrication requirements


China Design Steel Structure Storage Building Prefabricated Steel Warehouse
3.   Products scope of using:
China Design Steel Structure Storage Building Prefabricated Steel Warehouse



 
Steel is the most preferred metal for the construction of large structures such as bridges, single

storey and multi-storeys industrial buildings, and residential buildings
. Steel construction is most

often used in :

 
* High rise buildings because of its strength, low weight, and speed of construction
 
* Industrial buildings because of its ability to create large span spaces at low cost
 
* Warehouse buildings for the same reason
 
*  Residential buildings in a technique called light gauge steel construction
 
Temporary Structures as these are quick to set up and remove
 

China Design Steel Structure Storage Building Prefabricated Steel Warehouse

4. Material list for steel building

 

Material List For steel structuture building
 

Main Steel Frame
 
Steel  column
Fabricated by Q235 or Q345 Steel,   80*80 or 100*100 or 120*120 or 150*150 Square Tube, alkyd paiting, two primary painting, two finish painting.
 
Triangular Steel

structure roof

Fabricated by Q235 or Q345 Steel, C80, C100, C120, C140 Section steel,  alkyd paiting, two primary painting, two finish painting.
 
Roof Purlin
Fabricated by Q235 Steel, C80, C100, C120, C140 Section steel,  alkyd paiting, two primary painting, two finish painting.
 
anchor  bolt
10.9S, Galvanized
 

Roof and Wall 
 
Roof Panel
A: Insulated Steel Sandwich Panel wall

(1) Panel width: 950mm;

(2) Thickness: 50-1200mm.

(3) Powder coated Color steel on both sides:  0.4mm/0.5mm/0.6mm

B: Insulation: Polystyrene, Rockwool, Fiber Glass or Polyurethane

(1) Density of Rockwool: 50Kg/m3 ,80Kg/m3,100Kg/m3

(2) Density of Polystyrene: 12Kg/m3, 16KG/M3 20KG/M3

(3) Density of Polyurethane: 40Kg/m3

(4) Density of Fiber Glass:40Kg/m3, 60Kg/m3

 
Wall Panel
A: Insulated Steel Sandwich Panel wall

(1) Panel width: 950mm;

(2) Thickness: 50-1200mm.

(3) Powder coated Color steel on both sides:  0.4mm/0.5mm/0.6mm

B: Insulation: Polystyrene, Rockwool, Fiber Glass or Polyurethane

(1) Density of Rockwool: 50Kg/m3 ,80Kg/m3,100Kg/m3

(2) Density of Polystyrene: 12Kg/m3, 16KG/M3 20KG/M3

(3) Density of Polyurethane: 40Kg/m3

(4) Density of Fiber Glass: 40Kg/m3, 60Kg/m3

 
Edge Cover
0.4mm galvanized color steel , angle Alu.
 
Fasteners & Accessoreis
Nails\glue ect
 

Ceiling&Flooring
 
Ceiling
6mm gypsum board,with steel keel
 

Door and window
 
Door 
Sliding door ,roller shutter door ,side hung door
 
Window
aluminum alloy window
 

Plumbing System and Rain Water Drainage System as per building design
 

5. the processing of the material 
China Design Steel Structure Storage Building Prefabricated Steel Warehouse

6. packing,loading and container on destination China Design Steel Structure Storage Building Prefabricated Steel Warehouse

7. Erection in site
 
* Each piece of the system is very much alike - an H section with end plates for bolting. The

painted steel sections are lifted into place by crane, and then bolted together by construction

workers who have climbed to the appropriate position. In large buildings, construction can start

with two cranes working inwards from both ends; as they come together, one crane is removed

and the other finishes the job. Usually, each connection calls for six to twenty bolts to be installed.

Bolts are to be tightened to exactly the right amount of torque using a torque wrench.


China Design Steel Structure Storage Building Prefabricated Steel Warehouse
 
8.  Company simple profile

Weifang Tailai steel structure Co.Ltd
. one of the market leader for steel structure building business in China. more than 14year's experience .

* Weifang tailai is a professional  steel structure enterprise, including design, manufacture, and installation. 

* Weifang tailai have   employees over 180, 10 A level designer
 ,8 B grade designer and 20 engineer .the annual output of 100,000 tons, annual construction output 500,000 square meters.
 
* Weifang tailai has the most advanced production lines for steel structure, color steel corrugated sheet, H-section beam, C and Z-beam, roof and wall tiles, ect. 

* Weifang tailai also have  many advances equipment like CNC Model Flame Cutting Machine, CNC Drilling Machine, Submerged Arc Welding Machine, Correcting Machine, and more.

China Design Steel Structure Storage Building Prefabricated Steel Warehouse

 
9. RAQ

* Q1: What will client provide before we provide best quotaition ?
 

        A:  When we receive inquiry from client, client  please fills purchasing intention sheet as following :

 
No. information description
 
1
 
  Project Location
 
 2  
The total area (sqm)
 
 3  
Width *length*hight (m)
 
 4  
Wind load (speed)
 
 5  
Rain or snow load
 
 6  
Earthquake level
 
 7  
Project use propose
 
 8  
Exterior description
 
 9  
Interior description
 
 10  
Roof materials
 
 11  
Wall materials
 
 12  
Door description(position,size,type)
 
13  
Window description(position,size,type)
 
14  
crane(unit ,max weight/T, max lift hight/m)
 
15  
the others
 
  
* Q2: What are main materials of steel structure house?
 
        A: Our prefabricated house materials mainly include light steel structure, sandwich panel,                   roof tile, door, window, covers, screws and other accessories.
 
* Q3:  How you calculate the total area?
 
       A:   Industry calculation rule as below:
 
           (1)   house area = exterior house length X exterior house width X floor
 
           (2)  canopy area=exterior house length X 1/2 X canopy width
 
           (3)  staircase area = 4.5 sqm X quantity of staircase
 

           (4)  corridor area = exterior house length X corridor width
 
           (5)  total area = (1) + (2) + (3) + (4) + (5)
 
 
* Q4:  What drawing of house will factory supply?
 

          A:  Plan drawing, elevation drawing, sectional drawing, foundation drawing, installation                       drawing.
  
* Q5:  How many types of sandwich panel do you have?

 
          A: We have EPS(polystyrene)sandwich panel, rock wool sandwich panel, and                                     PVC(polyurethane)sandwich panel.
 
  
No.  
type of sandwich panel
thickness  volume weight  character
1  
EPS(polystyrene)
 
50mm, 75mm, 100mm
 
 
80-200Kg/m3
water-proof
2 Rock wool  
50mm, 75mm, 100mm
 
  200-400Kg /m3 fire-proof, sound-insulation, heat-preservation
 
3
PVC(polyurethane)  
50mm, 75mm, 100mm
 
 150-300/m3 water-proof, fire-proof, heat-proof, heat-insulation, heat-preservation, sound-insulation
 
10.  contact information
Company:
Weifang Tailai Steel Structure Engineering Co.,Ltd.
 
contact:
Debbie guo
 
Moblile:
+8618263608707
 
Address:         
  No.3430 Huangshan Rd.Linqu County,  Shandong Province, P.R.China
 

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now